Bridge connecting BGC, Ortigas to partially open May 2021 image
Bridge connecting BGC, Ortigas to partially open May 2021

11 minutes from BGC to Ortigas, and vice versa

C-5 South Link winds down speed limit to 60 km/h image
C-5 South Link winds down speed limit to 60 km/h

Don't go too fast along C-5 South Link, new speed limit is 60 km/h

This is why there are long lines for AutoSweep RFID tags image
This is why there are long lines for AutoSweep RFID tags

SMC's Head for RFID Operations explains why it's taking longer for RFID tags to be fitted

PRRD: More bicycle lanes to be put up in Metro Manila image
PRRD: More bicycle lanes to be put up in Metro Manila

EDSA, Quezon Avenue, Commonwealth, Roxas Blvd, R-10, C-5, Marcos Highway to get new bicycle lanes

MMDA to transfer select C5, Commonwealth U-Turn slots image
MMDA to transfer select C5, Commonwealth U-Turn slots

To give way to infrastructure projects, the MMDA will transfer some U-turn slots along C5, Commonwealth

Opening Soon: C-5 Southlink is the Merville flyover we've been waiting for image
Opening Soon: C-5 Southlink is the Merville flyover we've been waiting for

First portion of C-5 Southlink to cut Merville to C-5 drive to just 5-10 minutes