Confirmed: BGC-Ortigas Viaduct opening Sept 30 image
Confirmed: BGC-Ortigas Viaduct opening Sept 30

Phase 2 of Kalayaan Bridge Project to be completed on September 30, 2021

Viaduct connecting Kalayaan Bridge with BGC opens this Sept. image
Viaduct connecting Kalayaan Bridge with BGC opens this Sept.

Starting next month, motorists crossing Kalayaan Bridge can now head straight to 8th Avenue in BGC

Villar: Viaduct connecting Makati with BGC to open this Sept image
Villar: Viaduct connecting Makati with BGC to open this Sept

A direct link between Pasig, Makati, and BGC will be open to the public this September 2021

Kalayaan Bridge connecting Makati, Pasig now open image
Kalayaan Bridge connecting Makati, Pasig now open

DPWH to finish work on the entire BGC - Ortigas Center Link Road before the year ends