3.17-km Panguil Bay Bridge project 61% complete image
3.17-km Panguil Bay Bridge project 61% complete

Panguil Bay Bridge will cut travel time between Lanao Del Norte and Misamis Occidental from 2 hours to 7 minutes

Panguil Bay Bridge project is now at 56% image
Panguil Bay Bridge project is now at 56%

Travelling between Tangub City in Misamis Occidental and Lubod in Lanao Del Norte will soon only take 7 mins

DPWH starts laying down foundations for Panguil Bay Bridge image
DPWH starts laying down foundations for Panguil Bay Bridge

15 out of the 54 bored pile structures for Panguil Bay Bridge project are now in place

PHP 7.3B Panguil Bay Bridge to be finished in 2023 image
PHP 7.3B Panguil Bay Bridge to be finished in 2023

Major construction equipment to be used for Panguil Bay Bridge project have already arrived

There's already an access road for the Panguil Bay Bridge image
There's already an access road for the Panguil Bay Bridge

The Panguil Bay Bridge is slowly coming together

Panguil Bay Bridge construction to begin soon image
Panguil Bay Bridge construction to begin soon

Korean construction firms have confirmed their readiness with DPWH to build the mega bridge project