SMC, Ayala Corp ink deal to link Skyway Stage 4 with Arca South
Construction of Arca South on/off ramps for Skyway Stage 4 will begin sometime in 2024
Pangasinan Expressway: SMC, local gov't sign JV for project PLEX
PLEX will be a joint venture between SMC and LGU of Pangasinan
SMC Tollways: We are ready for cashless toll collection
Non-RFID users can use the tollway but will have to get an RFID sticker upon entry
RFID only: Dry run of cashless toll collection begins Sept 1
The dry run of cashless toll collection will run for two months according to the TRB
SMC Super Bridge: San Miguel to link Mindoro and Batangas
SMC already conducting a bathymetric survey to measure water depth for the planned construction of bridge connecting Batangas with Mindoro
61-km Nasugbu-Bauan Expressway project signed by SMC, Batangas
Ramon S. Ang said that substantial completion of the new expressway is at 48 months
EasyTrip users will be allowed to enroll on AutoSweep Jan 15
EasyTrip users will be able to use SMC Tollways with AutoSweep system without having to get another RFID sticker
SMC begins toll refund for affected AutoSweep, cash lane users
Motorists who paid via cash or AutoSweep RFID will be given a refund after last week's massive traffic jam
Red Horse Motors: San Miguel taking over Ferrari PH?
Ferrari has been looking for new representation in the Philippine market
SMC to build PHP 27.75B EV battery plant in Dinagat Islands
SMC EV battery plan to generate around 10,000 jobs