Class 1 2 3: Why are toll fees different based on vehicle type? image
Class 1 2 3: Why are toll fees different based on vehicle type?

Let's explain how the TRB classifies vehicles for tollways and why the toll fees are different

SMC to open first 20-km of SLEX TR4 in 2022 image
SMC to open first 20-km of SLEX TR4 in 2022

SLEX Toll Road 4 could be open to motorists sometime next year

SMC speeding up construction of SLEX to Quezon image
SMC speeding up construction of SLEX to Quezon

Once SLEX TR4 is complete, travel time between Sto. Tomas Batangas and Lucena City, Quezon will only take 1 hour

Construction of NLEX Connector has now reached Manila image
Construction of NLEX Connector has now reached Manila

From 16 percent, work on the upcoming NLEX Connector is now at 35 percent

Three-strike policy on toll roads effective May 15 image
Three-strike policy on toll roads effective May 15

The Toll Regulatory Board has put its foot down on motorists that don't have enough load on their RFID tags

Northbound Skyway steel ramp near SLEX-Alabang to be closed April 19 image
Northbound Skyway steel ramp near SLEX-Alabang to be closed April 19

With the northbound Skyway Extension now open, the steel ramp near SLEX-Alabang will be closed to northbound vehicles

PNP adds checkpoints along SLEX, Skyway image
PNP adds checkpoints along SLEX, Skyway

Metro Manila, surrounding provinces now have well over 1,100 checkpoints

You can soon enter Skyway from Susana Heights in SLEX image
You can soon enter Skyway from Susana Heights in SLEX

With the northbound Skyway Extension complete, motorists will be able to enter the elevated expressway faster and easier

TRB: Cash lanes to remain on expressways until further notice image
TRB: Cash lanes to remain on expressways until further notice

The full rollout of the cashless transaction in all expressways has been suspended indefinitely

Skyway Stage 3 closed from 10:00 PM to 4:00 AM until January 13 image
Skyway Stage 3 closed from 10:00 PM to 4:00 AM until January 13

To prepare for Skyway Stage 3's official opening, the expressway will be closed temporarily from 10:00 PM to 4:00 AM daily