Pasig Potrero Bridge on SCTEX reopens tomorrow Sept 29
After initially being reopened only to Class 1 vehicles, the Pasig Potrero bridge will reopen to all vehicle classes

Motorists and truckers who frequently go to and from Subic or Zambales will be able to travel along SCTEX once more. After being closed to the public last July and being opened initially to light vehicles only, NLEX Corporation has announced that the Pasig Potrero bridge along SCTEX will reopen starting tomorrow, September 29, 2023, at 6:00 AM.
“We are happy to announce that we are reopening the Pasig Potrero bridge to traffic after undergoing rehabilitation works. Travel will again be more convenient and seamless as this will alleviate traffic for motorists coming from Clark to Subic, and vice versa,” said J. Luigi L. Bautista, NLEX Corporation president.
Bautista also reassured the public that while the bridge will reopen to the public, the company will continue to conduct rehabilitation works to ensure the bridge's integrity and strength. It will be recalled that back on July 16, 2023, NLEX Corporation had to close the bridge to traffic to conduct an emergency safety inspection and assessment due to constant heavy rains.

After a thorough assessment by a third-party bridge expert, it was ultimately decided to temporarily close the Pasig Potrero bridge in order for necessary repair work to be done. This is also to ensure the safety of motorists as the heavy rains and strong river flow damaged portions of the said bridge.
The tollway company proceeded with emergency substructure strengthening works. However, the unpredictable weather and the high water level at the time resulted in difficulties in conducting safety works.
“It was very challenging whenever heavy rain started to pour. As much as we wanted to expedite the works, the heavy river flow and high water level in the area made it difficult for the team to proceed. There were times where we had to temporarily stop and wait for the weather to improve and water level to recede before we were able to resume,” added Bautista.
After undergoing another safety assessment, the bridge was reopened on August 7 to Class 1 vehicles while the strengthening works continued under the bridge. After all is said and done, the bridge will reopen tomorrow for all vehicle classes which will ensure seamless travel to and from Subic via SCTEX.
Related Posts

GWM CTO Nicole Wu visits PH, reaffirms brand's new energy vehicle push
GWM CTO Nicole Wu shares how brand's Intelligent New Energy lineup fits PH setting

2026 Mitsubishi Triton gets cosmetic updates for select variants in PH
Mitsubishi Motors PH introduces cosmetic changes to GX, GLX, and GLS variants of 2026 Triton

Resolved: LTO updates public on SCOs, driver's licenses suspended and revoked
Land Transportation Office updates on its crackdown towards erring motorists

Honda starts retail sales of 2026 Prelude hybrid in PH
2026 Honda Prelude now available for viewing at select Honda Cars PH dealerships

MG semi solid-state EV batteries to rollout by end of 2026
MG SolidCore Battery to deliver enhanced range, faster charging, better power delivery, and safety

LTO extends validity of licenses, registrations expiring this April 2026
For those with April birthdays and plate numbers ending in 4